FEATURED PROJECTS



 feasibility studies  vessel selection

AEC was engaged by KJVG via Camco to perform the full range of feasibility studies, vessel selection, detailed lift planning and detailed design of all rigging and installation aids for the installation of ten (10) Marine Loading Arms (MLA) for the Gorgon Gas Project.

 

detailed design  fabrication support

AEC was engaged by Laing O'Rourke to perform verification of 4 large platforms to be installed on the roofs of the LNG, Butane and Propane Tanks at the Ichthys LNG Plant in Darwin. AEC designed lifting rigging and several lifting beams for use throughout the project.

 

28 Tate Street

AEC is currently providing structural engineering services for a bespoke residence known as the "Origami House". The house features a complicated steel trussed roof requiring extensive detailing to ensure each roof member will fit on site. In addition to design services, AEC is providing on-site construction management support. Follow progress at the 28 Tate Street Blog.