Havila Harmony –Mezzanine Deck and Reel Frame Design & Installation

AEC was engaged by PDC to perform detailed design and site engineering for a mezzanine deck, deck grillage and other structures for the MV Havila Harmony installation support vessel. The vessel was commissioned for installation of subsea infrastructure for the Puffin Oil Field in the Timor Sea.

Back to Case Studies