KJVG, Camco

AEC was engaged by KJVG via Camco to perform the full range of feasibility studies, vessel selection, detailed lift planning and detailed design of all rigging and installation aids for the installation of ten (10) Marine Loading Arms (MLA) for the Gorgon Gas Project.

Back to Case Studies