![](https://www.allianceengineering.com.au/wp-content/uploads/2021/06/Case-Study-MNY-Offtake-hose-replacement-800x547.jpg)
MNY – Offtake Hose Replacement
AEC was engaged by Woodside to formulate a lift plan to facilitate the changeout of the flare tips on the Pluto Storage and Unloading flare tower.
AEC was engaged by Woodside to formulate a lift plan to facilitate the changeout of the flare tips on the Pluto Storage and Unloading flare tower.