Gorgon Marine Loading Arm Installation Project

AEC was engaged by KJVG via Camco to perform the full range of feasibility studies, vessel selection, detailed lift planning and detailed design of all rigging and installation aids for the installation of ten Marine Loading Arms (MLA) for the Gorgon Gas Project.

The preliminary engineering phase of the project was executed successfully and within budget, with the client expressing praise for AEC’s work. The detailed design phase was subsequently awarded to AEC and was completed in Q1 2015.

For more information on the Gorgon Gas Project read our Case Study.